Treat curb and lot access as the size limit
Measure gates, turns, overhead clearance and usable staging room before comparing container sizes. A compact unit that can be safely placed is more useful than added capacity a delivery truck cannot reach.

Coordinate the building, street and crew
Confirm property approval, delivery hours, traffic control needs and the door orientation. Keep sidewalks, fire connections, loading zones and neighboring entrances open throughout the job.
Keep the agreement tied to the project
Lease shipping containers for a renovation or construction phase with a planned pickup window. Purchase only where an established contractor or facility has approved recurring space and a realistic relocation plan.
A waterfront renovation needs a delivery reservation
High-rise and hospitality projects may have a loading dock but no spare trailer staging. Ask the building team to identify the approved unloading position, service hours and traffic-control arrangement before ordering. Streets, parked vehicles and overhead utilities can constrain the approach beyond the property boundary. Compare that working envelope with common footprints. A 20-foot box with disciplined phase-based loading can outperform a longer unit that consumes the space needed by every other supplier.
Plan what happens when the building work advances
Completed curbs, barriers and landscaping can close a route that existed during mobilization. Keep pickup on the construction plan and assign responsibility for preserving it. Rental storage suits a defined renovation when extension and removal terms match the schedule. Buying deserves an approved recurring commercial location and relocation plan. Review placement questions with property management, protecting accessible entrances, hydrants, emergency routes and neighboring service access throughout the job.