Plan around the people and the work
Determine occupancy, desk layout, meetings, storage, restroom access and daily traffic. That decides the number of doors and windows and how much clear aisle space remains. For a short-term field operation, compare the conversion with purpose-built mobile office options before committing to fabrication.
Control heat, cold and moisture
Insulation, vapor control, ventilation and HVAC should match the climate and use. Review container insulation choices before closing wall cavities.
Treat it as occupied space
Confirm permits, structural changes, electrical work, egress and accessibility with the relevant authority. Requirements differ by location and duration.
- Occupancy and furniture plan
- Insulation and HVAC
- Windows, doors and egress
- Electrical and local approvals
